Matters needing attention during maintenance of film blowing machine body

编辑:Shantou Shuangli Machinery Factory  时间:2016-01-25

1. Since the film blowing machine may damage the electrical components or fall off during the transportation of the film blowing machine, it should be strictly inspected first. To ensure personal safety, the machine must be connected to the ground, then the power supply, and then strictly check whether the motors of each part are running correctly , And pay attention to whether there is any leakage.

2. When installing, pay attention to adjusting the center line of the extruder head and the center of the traction roller to keep it horizontal and vertical, and not to deviate from the skewed.

3. As the outer diameter of the winding gradually increases during winding, please pay attention to the coordination of the traction speed and the winding speed, and please adjust it in time.

4. After the host is turned on, pay close attention to the operation of the host, adjust, correct, electrical instruments, and controllers in time to observe whether there is any abnormality or damage, and repair and replace it to ensure its normal operation.

5. The main gear box and traction reduction box of the plastic film blowing machine should be frequently refueled, and the gear oil should be replaced (the oil level can reach the mark level). Please replace the new gear oil within 10 days of use to ensure that the rotating parts are normal. To prevent running difficulties and overheating damage, check the tightness of each connection part to prevent loosening of bolts.

6. The compressed air in the bubble tube should be balanced, because the compressed air will leak out during the towing process to achieve the effect of timely replenishment.

7. Frequently clean and replace the filter screen in the machine head to prevent clogging, and prevent the plastic particles from being mixed with iron, sand, stone and other impurities from falling into the barrel to avoid damage to the screw and barrel.

8. It is strictly forbidden to rotate without material. When the barrel, tee, and die have not reached the required temperature, the host cannot be started.

9. When starting the main motor, start the motor first and then slowly accelerate, and stabilize after reaching the required speed; when turning off the main motor, first decelerate and then shut down.

10. When the film blowing machine is preheating, the heating should not be too long or too high to avoid clogging of the material port; if possible, the automatic temperature control system can be used to set the upper and lower tolerance temperature automatically, which is convenient and safe.